Planning | Urbandesign

Charleroi 54

15.87 | Charleroi 54

Environmental impact assessment (RIE) for the construction of 54 housings in Saint-Gilles

 

Awans Defrêne

15.86 | Awans Defrêne

Elaboration of an execution files for the design of a roadway at Awans

Gatti 145

15.85 | Gatti 145

Elaboration of an execution files for the layout/design of an overflow/ infiltration trench in Uccle

Val d'Or

15.84 | Val d'Or

Environmental impact assessment (RIE) for the construction of 30 housings in Woluwe-Saint-Pierre

 

Awans N3/N3i

15.83 | Awans N3/N3i

Elaboration of an execution files for the modification of the roundabout « N3-N3i » at Awans

T&T abords

15.76 | Tour-et-Taxis Abords

Environmental impact assessment (RIE) for the modification of the tree-lined driveway and the parking under the esplanade in Tour-and-Taxis site in Brussels

CSA_Rond-point

12.25 | Rond-point Wavre

Design of a roundabout on the N4 at the entrance of Wavre

 

SaintRoch

12.24 | Rue Saint-Roch

Technical study for the modification of an existing road in downtown of Perwez

BaraqueFraiture

12.16 | Baraque Fraiture

Technical assistance in the framework of the modification of the « Baraque Fraiture » crossroad in roundabout

PCA-Lapin

10.02 | PCA « Trou du Lapin »

Assisting the project author within the framework of revising two municipal layout plans in Seraing (habitat and economical activities)

 

PCA-Rabais

10.01 | PCA « Rabais »

Assisting the project author within the framework of finalizing the destination plan and the urban prescriptions for a municipal lay-out plan in Virton (habitat and tourist infrastructures)

Ottignies « Quartier de la gare »

703 | Ottignies « Quartier de la gare »

Urbanization project for the railway station surroundings and for the fallow land down below (habitat and trading) within the framework of Europan 9, a contest for urban planning

TT-IBGE

C768 | Tour-et-Taxis – Project « 6B »

Study on urban implementation of a layout project for public areas, for constructing a passive office building (16.000m²) and an underground parking at the Tour&Taxis site in Brussels

 

Jardins de la Chasse

C719 | « Jardins de la Chasse »

Study on the urban implementation of a mixed building project (1 administrative center + 22 apartment buildings) in Etterbeek within the framework of the environmental impact study

Europa

C712 | Project « Europa »

Study on the urban implementation of a construction project of an office building (40.000m²) in the European quarter of Brussels within the framework of an environmental impact study

Bois Paillot

C701 | Lotissement « Bois Paillot »

Land allotment project on private land located in Incourt

 

Tour-et-Taxis 6Ahttp://www.upcie.be/files/library/images/presentation-site/image-en-attente-urb.jpg

C682 | Tour-et-Taxis Project « 6A »

Coordination of the urban, technical and economical studies of a construction project for lodging (140.000m²), equipment, offices (100.000m²) and commercial premises (60.000m²) at the Tour&Taxis site in Brussels

Uccle Trois Rois

AC Uccle | « Trois Rois » Street

Development of the layout project for the street called “rue des Trois Rois” (Three Kings’ Road) in Uccle

Uccle Danco

AC Uccle | Danco Square

Development of the layout project for the square Emile Danco in Uccle