Environment
18.167 | Hôtel Rogier
Screening of the environnemental impacts for the renovation of the Sheraton in Brussels
18.159 | Sheraton
Environmental impact assessment (RIE) for the installation of a food-court in the basement floor of the « Manhattan center » in Brussels
18.157 | Kanaal
environmental impact assessment within the framework of the amending authorization files for the future project of « Kanal museum »
18.154 | Boitsfort 26
renvironmental impact assessment within the framework of the amending authorization files for the construction of three housing building in Brussels
18.153 | RIE Navez
Environmental impact assessment (RIE) for the construction of a housing building in brussels ( ~40 units and a nusery)
18.151 | Manhattan 3
Environmental impact assessment (RIE) for the renovation and extension of the « Manhattan Center » In Brussels
18.150 | Science 37
Coordination du dossier de demande de prolongation du permis d’environnement d'un bâtiment situé à 1000 Bruxelles et rédaction du rapport d’incidences.
17.138 | PE Monnaie
environmental impact assessment within the framework of the amending authorization files for the Royal Theater in Brussels
17.133 | Tour-et-Taxis Hôtel des Douanes
Environmental impact assessment within the framework of the amending authorization files (urbanism) for the « Hôtel des Douanes » project on the Tour&Taxis site in Brussels.
17.131 | Tour-et-Taxis Sheds
Environmental impact assessment within the framework of the amending authorization files (urbanism) for the « Sheds » project on the Tour&Taxis site in Brussels.
17.130 | Prekelinden
Environmental impact assessment and coordination of the authorization files (urbanisme) for the construction of housing building in Brussels.
17.127 | Tour-et-Taxis Gare Maritime 3
Environmental impact assessment (RIE) within the framework of the authorization files (urbanism) for the old harbor station on the Tour&Taxis site in Brussels.
17.126 | De Brouckère Tower
Environmental impact assessment (RIE) for the construction of a housing buildings in Forest (35 units with an underground parking)
17.123 | Decoster
Environmental impact assessment (RIE) for the construction of a housing buildings in Forest.
16.121 | Manhattan 2
Environmental impact assessment (RIE) for the renovation and extension of ground floor of the « Manhattan center » in Brussels.
16.115 | Laboratoire « SMB »
Coordination of the authorization files and environmental impact assessment for the « SMB » laboratory
16.114 | Les Sources
Environmental impact assessment (RIE) for the construction of housing buildings in Forest
16.113 | Tour-et-Taxis Gare Maritime 2
Environmental impact assessment and elaboration of the amending authorization files (urbanism) for the renovation of the facade, roofs and structure of the old harbor station and the réaffectation of « Hôtel de la Poste » on the Tour&Taxis site in Brussels.
16.112 | Villa Lorraine
Elaboration of the authorization files (environnement) for a existing bakery and pastry.
16.110 | Tour-et-Taxis Zone C
Environmental impact assessment and elaboration of the authorization files (urbanism) for the partial modification of a area on Tour&Taxis site in Brussels.
16.109 | Tour-et-Taxis voirie TACT
Environmental impact assessment within the framework of the amending authorization files (urbanism) for the « east-west » road on the Tour&Taxis site in Brussels.
16.105 | Tour-et-Taxis Entrepôt royal
Elaboration of the follow-up of the renewal of the authorization file of the Royal Warehouse, the Sheds and the parking on the Tour-et-Taxis site in Brussels
16.104 | Tour-et-Taxis « Le Méandre »
Elaboration of the support note within the framework of the amending authorization files (urbanism) for the « Méandre » Project on the Tour&Taxis site in Brussels.
16.103 | Manhattan
Elaboration of the support note with an impact screening for the renovation and extension of the « Manhattan Center » In Brussels
16.101 | Chancellerie
Environmental impact assessment (RIE) within the framework of the reunification project of two office buildings in Brussels
16.99 | Rouppe
Environmental impact assessment (RIE) for the construction of two housing buildings in Brussels
16.98 | Moisonneurs
Environmental impact assessment (RIE) for the demolition of an existing building and the construction of four housing buildings in Etterbeek
16.97 | Chapiteau Monnaie
Environmental impact assessment (RIE) for the establishment of a large tent utilized as a performance hall on the Tour&Taxis site in Brussels
16.95 | Woluwe 60
Coordination of the authorization files and environmental impact assessment for the demolition of an existing building and the construction an office building in Woluwe-Saint-Lambert
15.92 | The Dock
Environmental impact assessment (RIE) within the framework of « The Dock » project in Brussels
15.91 | Rogier Housing
Environmental impact assessment (RIE) for the construction of a housing and commercial building in Schaerbeek
15.82 | Prince d’Orange 49
Environmental impact assessment (RIE)
15.76 | Tour&Taxis Adriveway
Environmental impact assessment (RIE) for the modification of the tree-lined driveway and the parking under the esplanade in Tour-and-Taxis site in Brussels
15.75 | Verrewinkel 97
Environmental impact assessment (RIE) for the conversion project of a part of the building in Uccle
14.67 | Victoria Regina
Elaboration of the authorization files (urbanism) for the renovation of the « Victoria Regina » tower in Saint-Josse-ten-Noode
14.66 | Emaillerie
Environmental impact assessment and the elaboration of the authorization files (urbanism and environment) for the construction of the « SEB » project in Molenbeek-Saint-Jean
14.64 | Lidl Stalle
Environmental impact assessment (RIE) for the demolition of an existing building (Gamma) and the construction of two new commercial buildings (Gamma + Lidl) in Uccle
14.63 | Hamoir 14
Environmental impact assessment (RIE) for the construction of two residential buildings in Uccle
14.53 | Euroveiling
Environmental impact assessment (RIE) for the restauration of the courthouse on Régence street in Brussels
14.48 | Tervuren 368
Environmental impact assessment and the elaboration of the authorization files (urbanism and environment) for the construction of two housing buildings in Woluwe-Saint-Pierre
14.47 | Dolez Paturins
Environmental impact assessment and the elaboration of the authorization files (urbanism and environment) for the construction of three housing buildings in Uccle
14.45 | Victoire 188
Environmental impact assessment within the framework of the elaboration of the authorization files (urbanism) in Saint-Gilles
14.44 | Gatti de Gamond 145
Environmental impact assessment and the elaboration of the authorization files (urbanism and environment) in Uccle
14.41 | Michel-Ange 79
Acoustic impact study for a design project of pedestrian traffic between housing gardens
13.40 | Régence 65
Environmental impact assessment (RIE) for the restauration of the courthouse on Régence street in Brussels
13.39 | Célidée 33
Environmental impact assessment (RIE) for a residential building project in Etterbeek
13.35 | Tour&Taxis Project « Le Méandre »
Elaboration of the preliminary note for the environmental impact study within the framework of the construction of a office building in Brussels
13.34 | Souverain 2
Environmental impact assessment (RIE) for the rehabilitation of an office building into a residential building
13.31 | European Communication School
Environmental impact assessment (RIE) for the establishment of a school in Brussels
12.27 | Bordet 11
Elaboration of the authorization file for the technical facilities of an existing office building (3.400 m²)
12.22 | Tour&Taxis « Project M4 »
Elaboration of the authorization file and environnemental assessment for the modification of an residential building project. (204 units, 22.000m²)
12.19 | Ekla
Environmental impact assessment (RIE) for a residential and office building project in Molenbeek
12.15 | Saint-Pierre
Environmental impact assessment for a residential building project at Etterbeek (100 units)
12.12 | Papeteries de Genval
Technical assistance for the design of sewerage and associated infrastuctures (Collector, overflow, infrastructures)
12.11 | Bon Pasteur
Editing the environmental impact report within the framework of the application for a permit (urban planning and environment) to build 170 lodgings and an underground parking with 170 parking places
10.05 | « Pepinster »
Traffic Study generated by the Intermarché project at Hannut
8.01 | Cadastre du Bruit routier RW
Technical assistance within the framework of the realization of the traffic noise register in the Walloon Region
C768 | Tour&Taxis « 6B »
Assistance within the framework of the environmental impact study for the construction project of a passive office building
(16.000m2) and an underground parking (250 places) on the Tour&Taxis site in Brussels
C719 | Jardins de la Chasse
Assistance within the framework of the environmental impact study for the construction project of an administrative center and 22 buildings for lodging on the “Jardins de la Chasse” site in Etterbeek
C717 | Bassem
Environmental impact report with regard to the construction project for several housing buildings and a cultural centre on the road called “rue Bassem” in Auderghem
C712 | Europa
Assistance within the framework of the environmental impact study for the construction project of an office building (40.000m²) in the European Quarter in Brussels
C682 | Tour&Taxis « ZIR 6A »
Methodological, technical coordination and follow-up on studies in the domains of urban planning, patrimony, landscape, and in the social and economical field, within the framework of the environmental impact study for urbanization of the ZIR 6A on the Tour&Taxis site in Brussels
C669 | Matermaco
Assistance within the framework of the environmental impact study for the construction project of 300 lodgings on the Matermaco site in Schaerbeek
xxx | Orp-Jauche
Study on the sewerage network within the framework of an allotment in Orp-Jauche