Environment

Hôtel Rogier

18.167 | Hôtel Rogier

Screening of the environnemental impacts for the renovation of the Sheraton in Brussels

 

Sheraton

18.159 | Sheraton

Environmental impact assessment (RIE) for the installation of a food-court in the basement floor of the « Manhattan center » in Brussels

Kanaal

18.157 | Kanaal

environmental impact assessment within the framework of the amending authorization files  for the future project of « Kanal museum »

Boitsfort

18.154 | Boitsfort 26

renvironmental impact assessment within the framework of the amending authorization files  for the construction of three housing building in Brussels

 

Navez

18.153 | RIE Navez

Environmental impact assessment (RIE) for the construction of a housing building in brussels ( ~40 units and a nusery) 

Manhattan

18.151 | Manhattan 3

Environmental impact assessment (RIE) for the renovation and extension of the « Manhattan Center » In Brussels 

Science 37

18.150 | Science 37

Coordination du dossier de demande de prolongation du permis d’environnement d'un bâtiment situé à 1000 Bruxelles et rédaction du rapport d’incidences.

 

Monnaie

17.138 | PE Monnaie

environmental impact assessment within the framework of the amending authorization files for the Royal Theater in  Brussels

Tour-et-Taxis Hôtel des Douanes

17.133 | Tour-et-Taxis Hôtel des Douanes

Environmental impact assessment within the framework of the amending authorization files (urbanism) for the « Hôtel des Douanes » project on the Tour&Taxis site in Brussels.

Tour-et-Taxis Sheds

17.131 | Tour-et-Taxis Sheds

Environmental impact assessment within the framework of the amending authorization files (urbanism) for the « Sheds » project on the Tour&Taxis site in Brussels.

 

Prekelinden

17.130 | Prekelinden

Environmental impact assessment and coordination of the authorization files (urbanisme) for the construction of housing building in Brussels.

Tour-et-Taxis Gare Maritime

17.127 | Tour-et-Taxis Gare Maritime 3

Environmental impact assessment (RIE) within the framework of the authorization files (urbanism) for the old harbor station on the Tour&Taxis site in Brussels.

De Brouckère Tower

17.126 | De Brouckère Tower

Environmental impact assessment (RIE) for the construction of a housing buildings in Forest (35 units with an underground parking)

 

Decoster

17.123 | Decoster

Environmental impact assessment (RIE) for the construction of a housing buildings in Forest.

Manhattan 2

16.121 | Manhattan 2

Environmental impact assessment (RIE) for the renovation and extension of ground floor of the « Manhattan center » in Brussels.

Laboratoire SMB

16.115 | Laboratoire « SMB »

Coordination of the authorization files and environmental impact assessment for the « SMB » laboratory

 

Les Sources

16.114 | Les Sources

Environmental impact assessment (RIE) for the construction of housing buildings in Forest

Tour-et-Taxis Gare Maritime

16.113 | Tour-et-Taxis Gare Maritime 2

Environmental impact assessment and elaboration of the amending authorization files (urbanism) for the renovation of the facade, roofs and structure of the old harbor station and the réaffectation of « Hôtel de la Poste » on the Tour&Taxis site in Brussels.

chancellerie

16.112 | Villa Lorraine

Elaboration of the authorization files (environnement) for a existing bakery and pastry.

 

Tour-et-Taxis Zone C

16.110 | Tour-et-Taxis Zone C

Environmental impact assessment and elaboration of the authorization files (urbanism) for the partial modification of a area on Tour&Taxis site in Brussels.

Tour-et-Taxis voirie TACT

16.109 | Tour-et-Taxis voirie TACT

Environmental impact assessment within the framework of the amending authorization files (urbanism) for the « east-west » road on the Tour&Taxis site in Brussels.

Tour-et-Taxis entrepôt royal

16.105 | Tour-et-Taxis Entrepôt royal

Elaboration of the follow-up of the renewal of the authorization file of the Royal Warehouse, the Sheds and the parking on the Tour-et-Taxis site in Brussels

 

Tour-et-Taxis Méandre

16.104 | Tour-et-Taxis « Le Méandre »

Elaboration of the support note within the framework of the amending authorization files (urbanism) for the « Méandre » Project on the Tour&Taxis site in Brussels.

Manhattan

16.103 | Manhattan

Elaboration of the support note with an impact screening for the renovation and extension of the « Manhattan Center » In Brussels

chancellerie

16.101 | Chancellerie

Environmental impact assessment (RIE) within the framework of the reunification project of two office buildings in Brussels

 

Rouppe

16.99 | Rouppe

Environmental impact assessment (RIE) for the construction of two housing buildings in Brussels

Moisonneurs

16.98 | Moisonneurs

Environmental impact assessment (RIE) for the demolition of an existing building and the construction of four housing buildings in Etterbeek

Chapiteau Monnaie

16.97 | Chapiteau Monnaie

Environmental impact assessment (RIE) for the establishment of a large tent utilized as a performance hall on the Tour&Taxis site in Brussels

 

Woluwe 60

16.95 | Woluwe 60

Coordination of the authorization files and environmental impact assessment for the demolition of an existing building and the construction an office building in Woluwe-Saint-Lambert

The Dock

15.92 | The Dock

Environmental impact assessment (RIE) within the framework of « The Dock » project in Brussels

Rogier Housing

15.91 | Rogier Housing

Environmental impact assessment (RIE) for the construction of a housing and commercial building in Schaerbeek

 

Prince d’Orange 49

15.82 | Prince d’Orange 49

Environmental impact assessment (RIE)

Tour-et-Taxis Abords

15.76 | Tour&Taxis Adriveway

Environmental impact assessment (RIE) for the modification of the tree-lined driveway and the parking under the esplanade in Tour-and-Taxis site in Brussels

Verrewinkel 97

15.75 | Verrewinkel 97

Environmental impact assessment (RIE) for the conversion project of a part of the building in Uccle

 

Victoria Regina

14.67 | Victoria Regina

Elaboration of the authorization files (urbanism) for the renovation of the « Victoria Regina » tower in Saint-Josse-ten-Noode

Emaillerie

14.66 | Emaillerie

Environmental impact assessment and the elaboration of the authorization files (urbanism and environment) for the construction of the « SEB » project in Molenbeek-Saint-Jean

Lidl Stalle

14.64 | Lidl Stalle

Environmental impact assessment (RIE) for the demolition of an existing building (Gamma) and the construction of two new commercial buildings (Gamma + Lidl) in Uccle

 

Hamoir 14

14.63 | Hamoir 14

Environmental impact assessment (RIE) for the construction of two residential buildings in Uccle

Euroveiling

14.53 | Euroveiling

Environmental impact assessment (RIE) for the restauration of the courthouse on Régence street in Brussels

Tervuren 368

14.48 | Tervuren 368

Environmental impact assessment and the elaboration of the authorization files (urbanism and environment) for the construction of two housing buildings in Woluwe-Saint-Pierre

 

Dolez Paturins

14.47 | Dolez Paturins

Environmental impact assessment and the elaboration of the authorization files (urbanism and environment) for the construction of three housing buildings in Uccle

Victoire 188

14.45 | Victoire 188

Environmental impact assessment within the framework of the elaboration of the authorization files (urbanism) in Saint-Gilles

Gatti de Gamond

14.44 | Gatti de Gamond 145

Environmental impact assessment and the elaboration of the authorization files (urbanism and environment) in Uccle

 

Michel-Ange 79

14.41 | Michel-Ange 79

Acoustic impact study for a design project of pedestrian traffic between housing gardens

regence

13.40 | Régence 65

Environmental impact assessment (RIE) for the restauration of the courthouse on Régence street in Brussels

celidee

13.39 | Célidée 33

Environmental impact assessment (RIE) for a residential building project in Etterbeek

 

Meandre

13.35 | Tour&Taxis Project « Le Méandre »

Elaboration of the preliminary note for the environmental impact study within the framework of the construction of a office building in Brussels

ECS

13.34 | Souverain 2

Environmental impact assessment (RIE) for the rehabilitation of an office building into a residential building

ECS

13.31 | European Communication School

Environmental impact assessment (RIE) for the establishment of a school in Brussels

 

Bordet 11

12.27 | Bordet 11

Elaboration of the authorization file for the technical facilities of an existing office building (3.400 m²)

TT-M4

12.22 | Tour&Taxis « Project M4 »

Elaboration of the authorization file and environnemental assessment for the modification of an residential building project. (204 units, 22.000m²)

Ekla

12.19 | Ekla

Environmental impact assessment (RIE) for a residential and office building project in Molenbeek

 

StPierre

12.15 | Saint-Pierre

Environmental impact assessment for a residential building project at Etterbeek (100 units)

Genval

12.12 | Papeteries de Genval

Technical assistance for the design of sewerage and associated infrastuctures (Collector, overflow, infrastructures)

Bon Pasteur

12.11 | Bon Pasteur

Editing the environmental impact report within the framework of the application for a permit (urban planning and environment) to build 170 lodgings and an underground parking with 170 parking places

 

Pepinster

10.05 | « Pepinster »

Traffic Study generated by the Intermarché project at Hannut

RBC

8.01 | Cadastre du Bruit routier RW

Technical assistance within the framework of the realization of the traffic noise register in the Walloon Region

Tour-et-Taxis 6b

C768 | Tour&Taxis « 6B »

Assistance within the framework of the environmental impact study for the construction project of a passive office building

(16.000m2) and an underground parking (250 places) on the Tour&Taxis site in Brussels

 

jardins chasse

C719 | Jardins de la Chasse

Assistance within the framework of the environmental impact study for the construction project of an administrative center and 22 buildings for lodging on the “Jardins de la Chasse” site in Etterbeek

Bassem

C717 | Bassem

Environmental impact report with regard to the construction project for several housing buildings and a cultural centre on the road called “rue Bassem” in Auderghem

Europa

C712 | Europa

Assistance within the framework of the environmental impact study for the construction project of an office building (40.000m²) in the European Quarter in Brussels

 

Tour-et-Taxis 6A

C682 | Tour&Taxis « ZIR 6A »

Methodological, technical coordination and follow-up on studies in the domains of urban planning, patrimony, landscape, and in the social and economical field, within the framework of the environmental impact study for urbanization of the ZIR 6A on the Tour&Taxis site in Brussels

Matermaco

C669 | Matermaco

Assistance within the framework of the environmental impact study for the construction project of 300 lodgings on the Matermaco site in Schaerbeek

Orp-Jauche

xxx | Orp-Jauche

Study on the sewerage network within the framework of an allotment in Orp-Jauche